ULTRATILE ROOF REPLACEMENT
PROJECT DESCRIPTION
This Ultratile harvest brown slate warm roof was installed over a week, with the electrics and plastering completed later.
As the existing conservatory frames were in good condition we were able to assemble the roof on top of them. The clients opted to have a large area of glazing in the bay part.